New work center: What needs to be done? :: EN
Tutorials / Betriebs- & Maschinendatenerfassung - Tutorials

New work center: What needs to be done? :: EN

This tutorial will show you all the necessary steps that are relevant for creating or integrating a new work center/machine/line in cronetwork. The tutorial also provides a comprehensive overview of the scope and influence of a work center in cronetwork.


You will find answers to these and other questions in the tutorial:

  • When is the right time to integrate a new work center into cronetwork?
  • What procedures are possible or recommended when creating a work center?
  • What do I have to pay attention to when creating a work center if several cronetwork modules such as detailed planning, personnel time, operating data, machine data etc. are in use?
  • What steps are necessary in order to be able to register the work center correctly at the online terminal?
  • Which fields and indicators at the work center must be observed and defined for detailed planning?
  • What is the work center used for during staff time and do I need to take anything into account here?
  • In which areas in cronetwork does the work center still have a relevant influence?
  • How can I display work center information on the portal/portal terminal?

 

Level: basic

Recommended prior knowledge: Area of responsibility Master data maintenance in cronetwork

Target group: Users & key users

Availability: 365 days

Für diesen Kurs ist derzeit keine Beschreibung verfügbar

Kursinhalt

  • Kursmodul New work center: What needs to be done? :: EN
    • Introduction (0:17) >>
    • Create a work center [252] (4:33) >>
    • Create a terminal [55] (5:33) >>
    • Change/Modify a work center [912] (3:39) >>